IPSWICH, MA
GENERAL CONTRACTOR
Columbia Construction
ENGINEER
BR+A Consulting Engineers & NSMC (Design Build)
ARCHITECT
ARC
Twenty years later after NSMC completed the original New England Biolabs facility, we were selected as a team member to expand its headquarters to support its growth and accommodate increased manufacturing and research capacity with a new building on their sustainable campus.
The planned expansion includes a new 100,000 square foot laboratory building, underground parking lot and above-ground parking space.
FEATURES
NSMC was responsible for the Plumbing/Process Piping scope of work, including:
-
RODI / Reject Water Skid and Piping System
-
Grey Water collection / storage system
-
Specialized Laboratory Waste and Vent equipment and piping system
-
Compressed Air (CA) and Vacuum (VAC) Equipment and piping systems
-
CO2, Argon, Helium & N2 Manifolds & piping systems
-
Interior Domestic, Protected, and Tempered water piping
-
Underground Parking Drains and Gas, Oil, Sand separator piping
-
Commercial Kitchen
-
High Efficiency plumbing fixtures