• Beverly, MA Hospital Master Plan

    Posted on December 1, 2014 by North Shore Mechanical in News, School/Hospital Project.

    Award Contractbeverly ma hospital master plan
    $858,465

    General Contractor
    William A Berry & Son, Inc.
    Danvers, MA

    Engineer
    Thompson Consultants, Inc.
    Marion, MA

    Architect
    Steffian Bradley Architects
    Boston, MA

    Project Description
    Beverly Hospital’s Master Plan is a major multi-phased expansion and renovation project of the Beverly Hospital Campus. NSMC has been responsible for the plumbing and medical gas piping for 95,000sq.ft of additions and existing building renovations, with tie-ins to existing building infrastructure systems. To perform this work with-in the operating hospital—without interference to daily operations—and maintain noise control levels, extreme care with detailed planning and coordination was required on each phase of the build-out, relocation and subsequent staging for demolition as we moved through the facility.

    Areas affected by the project included: reception, triage, emergency and ambulatory suite, nurse’s stations, psychiatric ward patient center, general patient rooms and medical office suites.

    Features

    • Medical Gas Systems – O2/Vac/MA-certified
    • Rain leader/Storm Water Drainage/Roof Drains
    • Domestic Cold & Hot Water Systems
    • Sanitary Waste and Vent Systems
    • Coordination with Construction Team & Hospital personnel for major system shut-downs & tie-ins

Leave a Reply

Your email address will not be published. Required fields are marked *